On June 27, 2013 the Director of Los Alamos National Laboratory, Charles McMillan, announced to LANL staff that he was temporarily halting plutonium operations at PF-4. Evidently, this was in response to a report by the Department of Energy (DOE) Office of the Inspector General, released to the public three days earlier, in which LANL's plutonium operations were criticized as being unsafe. The DOE's report followed analyses by the Congressionally mandated Defense Nuclear Facilities Safety Board (DNFSB) of the hazardous conditions at PF-4. And today, the DNFSB continues to bring these conditions to the attention of the new DOE Secretary Ernest J. Moniz.
Meanwhile, in spite of LANL's having signed an agreement with the State of New Mexico to make all of its environmentally relevant information available to the general public, none of this information about potential hazards at PF-4 can be found on LANL's website.
...........................................................................................
DOE - Office of the Inspector General (taken from DOE website):
AUDIT REPORT: OAS-M-13-04 / June 24, 2013 / Mitigation of Natural Disasters at Los Alamos National Laboratory
Los Alamos National Laboratory (Los Alamos) is at some risk of seismic events and susceptible to forest fires, including those started by lightning. Since 2000, there have been two major forest fires that threatened Los Alamos.
Although Los Alamos had made progress in upgrading existing nuclear facilities, concerns remained regarding the mitigation of risks related to natural disasters. Specifically, we found seismic issues affecting the Plutonium Facility that remain to be addressed. Additionally, we found that fire protection and prevention vulnerabilities in Area G Waste Storage and Disposal Facility (Area G) continue to exist. Further, we found that several known risks exist with compensatory measures implemented in Area G that may lessen their efficacy in mitigating natural disasters. Los Alamos' processes and procedures have not always been fully effective in ensuring that hazards, including natural disasters, are fully analyzed and effectively mitigated.
National Nuclear Security Administration officials responsible for overseeing Los Alamos pointed out that decisions to budget and schedule mitigation measures are based on factors including the probability of an event occurring, such as a seismic event, and whether a structure is considered to be a permanent or limited life facility. While a number of compensatory and corrective actions have been completed, in our view, further actions are needed to mitigate existing vulnerabilities. Management concurred with the report's recommendations and indicated that corrective actions have been or would be initiated to mitigate potential risks.
...........................................................................................
July 15, 2013
Defense Nuclear Facilities Safety Board (DNFSB) writes to the new Department Of Energy (DOE) Secretary Ernest J. Moniz:
The staff of DNFSB performed a review of the Criticality Safety Program at Los Alamos National Laboratory (LANL) in May 2013. This review indicated significant non-compliances with applicable DOE requirements and industry standards ... . In addition, this review identified criticality safety concerns stemming from weaknesses in the conduct of operations at the Plutonium Facility. The Board notes that some of these deficiencies are long standing and indicate flaws in the federal oversight and contractor assurance systems.
The Board is aware that the Laboratory Director paused programmatic activities in the Plutonium Facility on June 27, 2013. ... the Board requests a report and briefing by the National Nuclear Security Administration ... that details a) any corrective actions NNSA is taking to incorporate criticality safety controls into procedures, ..., b) any root causes NNSA has identified for recent criticality safety infractions, and c) any improvements NNSA has determined are needed to the federal oversight and contractor assurance systems relative to criticality safety, conduct of operations, and effectiveness of corrective actions.
.............................................................................................
July 17, 2013
DNFSB writes again to DOE Secretary Ernest J. Moniz:
The DNFSB is responding to former DOE Secretary Chu's March 27, 2013 letter assessing public and worker protection for a seismic collapse scenario at the Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4). In that letter, Sec. Chu concluded that PF-4 can continue to operate safely, provide its confinement safety function, and meet the DOE's quantitative safety objectives ... .
The Board does not agree with the methodology used by the LANL contractor for the seismic analysis upon which Sec. Chu based his conclusions. Consequently, the Board does not agree with the NNSA's conclusion that these modeling results demonstrate compliance with DOE standards for confinement integrity following a design basis earthquake. ... .
Sunday, July 21, 2013
Friday, June 28, 2013
Progress is Very Slow
In a letter dated 20 June, 2013 the Defense Nuclear Facilities Safety Board congratulated Dr. Ernest Moniz upon his appointment as the new Department of Energy Secretary. The Board went on to remind the new Secretary of the challenges facing him, of which the most pressing was the possible collapse of the Plutonium Facility (PF-4) at Los Alamos National Laboratory, in the event of a design basis earthquake.
The Board noted that its previous studies of seismic hazards at LANL had shown that the collapse of PF-4 during a design basis earthquake was a plausible outcome, along with the release of massive amounts of plutonium dust into the air over the nearby communities. Subsequently, LANL's own in-house analysis showed that the risk of such a catastrophic accident was not negligible. Consequently, LANL has been working to upgrade the earthquake resistance of PF-4, as well as to reduce the amount of plutonium being stored at the site.
Citizen activist groups in the Los Alamos area have continued to remind the DOE of its obligation to protect
surrounding communities from the dangers inherent in having a nuclear weapons lab in their midst. These groups have provided input to the DNFSB, supporting its judgement of the dire effects on local populations of a design basis seismic event at PF-4. (For example, see my blogpost of 24 Nov 2011 entitled "Accidental Fall-out from LANL.")
.....................................................................
The Obama Administration has announced its intent to abandon construction of the Mixed OXide waste plutonium fuel facility at the Savannah River nuclear weapons site, the escalating costs of this unfinished factory having been judged to be prohibitive. However, no acceptable alternative plan for disposition of plutonium from retired nuclear weapons is being proposed. An unintended consequence of this failure to follow through with the MOX fuel program may be the collapse of the agreement with the Russians to dispose of excess plutonium from nuclear weapons. (See my blogpost of 22 Aug 2012 entitled "MOX Redux: Better to Bury than to Burn?")
.....................................................................
The Obama Administration has also announced its intent to reduce the number of deployed strategic nuclear warheads in the US arsenal to ~1000, contingent upon the Russians agreeing to a similar reduction. However, the Russians have expressed an unwillingness to proceed, citing America's threatening increase in the size of its anti-ballistic missile forces. (Since the US unilaterally withdrew from the Anti-Ballistic Missile Treaty in 2002.)
.....................................................................
Finally, the Obama Administration intends to reduce the amount of carbon dioxide being released into the atmosphere by the burning of fossil fuels, especially from coal burning power plants, principally by EPA regulations authorized under the Clean Air Act. As an important component of this program, construction of new nuclear power plants is being encouraged. (See the Presidents speech at Georgetown University on 25 June 2013.) Unfortunately, however, no provision is being made for the disposition of waste from these new power plants, nor for the disposition of waste from the ~100 aging nuclear power plants still in operation. (A problem since the Administration decided to abandon construction of the Yucca Mountain Nuclear Waste Repository in 2010.)
...................................................................
Saturday, 29 June 2013: Both the Santa Fe New Mexican and the Los Alamos Monitor report that the LANL Director Charles McMillan announced on Thursday that certain operations involving plutonium at PF-4 will be halted until safety problems identified in a recent DOE Office of the Inspector General report have been mitigated. This report, entitled "Mitigation of Natural Disasters at Los Alamos National Laboratory", and dated June 2013, is available online. It makes for some very interesting reading.
The Board noted that its previous studies of seismic hazards at LANL had shown that the collapse of PF-4 during a design basis earthquake was a plausible outcome, along with the release of massive amounts of plutonium dust into the air over the nearby communities. Subsequently, LANL's own in-house analysis showed that the risk of such a catastrophic accident was not negligible. Consequently, LANL has been working to upgrade the earthquake resistance of PF-4, as well as to reduce the amount of plutonium being stored at the site.
Citizen activist groups in the Los Alamos area have continued to remind the DOE of its obligation to protect
surrounding communities from the dangers inherent in having a nuclear weapons lab in their midst. These groups have provided input to the DNFSB, supporting its judgement of the dire effects on local populations of a design basis seismic event at PF-4. (For example, see my blogpost of 24 Nov 2011 entitled "Accidental Fall-out from LANL.")
.....................................................................
The Obama Administration has announced its intent to abandon construction of the Mixed OXide waste plutonium fuel facility at the Savannah River nuclear weapons site, the escalating costs of this unfinished factory having been judged to be prohibitive. However, no acceptable alternative plan for disposition of plutonium from retired nuclear weapons is being proposed. An unintended consequence of this failure to follow through with the MOX fuel program may be the collapse of the agreement with the Russians to dispose of excess plutonium from nuclear weapons. (See my blogpost of 22 Aug 2012 entitled "MOX Redux: Better to Bury than to Burn?")
.....................................................................
The Obama Administration has also announced its intent to reduce the number of deployed strategic nuclear warheads in the US arsenal to ~1000, contingent upon the Russians agreeing to a similar reduction. However, the Russians have expressed an unwillingness to proceed, citing America's threatening increase in the size of its anti-ballistic missile forces. (Since the US unilaterally withdrew from the Anti-Ballistic Missile Treaty in 2002.)
.....................................................................
Finally, the Obama Administration intends to reduce the amount of carbon dioxide being released into the atmosphere by the burning of fossil fuels, especially from coal burning power plants, principally by EPA regulations authorized under the Clean Air Act. As an important component of this program, construction of new nuclear power plants is being encouraged. (See the Presidents speech at Georgetown University on 25 June 2013.) Unfortunately, however, no provision is being made for the disposition of waste from these new power plants, nor for the disposition of waste from the ~100 aging nuclear power plants still in operation. (A problem since the Administration decided to abandon construction of the Yucca Mountain Nuclear Waste Repository in 2010.)
...................................................................
Saturday, 29 June 2013: Both the Santa Fe New Mexican and the Los Alamos Monitor report that the LANL Director Charles McMillan announced on Thursday that certain operations involving plutonium at PF-4 will be halted until safety problems identified in a recent DOE Office of the Inspector General report have been mitigated. This report, entitled "Mitigation of Natural Disasters at Los Alamos National Laboratory", and dated June 2013, is available online. It makes for some very interesting reading.
Monday, April 15, 2013
Why a Nuke Park?
Iran's President Mahmoud Ahmadinejad (who, in 1997 received a doctorate in civil engineering and traffic transportation planning from Iran University of Science and Technology (IUST)) boasted recently about his country's accumulating knowledge of the difficult, dirty, and dangerous technology of nuclear weapons. He made his brag about Iran's progress toward mastering this antiquated form of weapons science and engineering on National Technology Day, a holiday created some years ago by Mr. Ahmadinejad himself, while attempting to stir public interest in Iran's "nuclear energy achievements". He also reported about Iran's recent "development of five new medicines and a homemade electron accelerator". Perhaps he hoped that these modest claims will help to give Iran some "street cred"; i.e, akin to that of the bizarrely bellicose North Korea, with its recent development and testing of small nuclear devices, along with the missiles which may eventually be able to deliver them to distant targets.
Meanwhile, in the USA there is an ongoing effort among military enthusiasts to commemorate the 1940's design and testing of American nuclear weapons in the form of a system of national parks proposed for Los Alamos, NM, Oak Ridge, TN, and Hanford, WA. The motivation underlying this project is unclear: is this seemingly boastful idea simply fear-driven, or is it an expression of some American bellicosity?
Los Alamos was where the nuclear bombs were first designed and built, Oak Ridge was where U235 fuel for the Hiroshima bomb (Little Boy) was obtained (purified from naturally occurring uranium in a gaseous diffusion process), and Hanford was where Pu239 for the Nagasaki bomb (Fat Man) was produced (by chemical extraction from the radioactive detritus of dedicated nuclear reactors.) The Hiroshima bomb of 6 Aug 1945 killed between 90,000 and 166,000 persons; the Nagasaki bomb of 9 Aug 1945 killed upwards of 40,000 persons. However, neither of these two attacks were quite as deadly as the 9-10 March, 1945 attack on Tokyo by B-29's armed with incendiary bombs; in this raid, more than 100,000 people died. Earlier, in the bombing of Dresden, on nights between 13-15 Feb 1945, more than 22,000 persons died. Presumably, none of these horrifying facts would be mentioned on any of the placards adorning the proposed national parks.
To celebrate the creation of weapons of mass destruction in a national park setting, a setting normally geared towards serene contemplation, and towards the diversion and education of young people, seems wrong-headed in the extreme. The weapons enthusiasts who are making this bizarre proposal should be ashamed.
Wednesday, April 3, 2013
DOE/NNSA Safety Problems
As Department Of Energy/National Nuclear Security Administration (DOE/NNSA) struggles to maintain the viability of the U. S. nuclear weapons complex, new problems have emerged with its safety practices. These problems may be a reflection of the inherent difficulty of dealing consistently and successfully with the antiquated and dangerous technology of nuclear weapons.
Today, the New York Time's Matthew Wald described the continued failure of DOE/NNSA to complete the Hanford, Washington Waste Treatment and Immobilization Plant (WTP) construction project. Currently, it is estimated that this project has been 60% completed, and that its total cost will be in excess of $12 billion. Many problems with the design of WTP have been identified recently, which reflect safety concerns, and required changes to the design may be extensive. Senator Ron Wyden (Dem. Oregon), who chairs the Senate Energy Committee, with DOE oversight responsibility, is focusing his attention on this problem.
........................................................................
1 April 2013 / In a letter, Defense Nuclear Facilities Safety Board (DNFSB) Chairman Peter Winokur reported to U. S. Sen. Ron Wyden about the state of nuclear safety at Hanford Site. Three separate areas of concern were addressed: (1) safety issues associated with the Hanford Tank Farms; (2) unresolved technical matters related to the design of the Waste Treatment and Immobilization Plant (WTP); (3) the current state of Hanford's safety culture. DNFSB performed this study at Sen. Wyden's request.
........................................................................
27 March 2013 / Outgoing DOE Sec. Chu wrote to DNFSB to inform them that the status of the safety upgrade at LANL's PF-4 (Plutonium Facility) has progressed to the extent that he now felt it acceptable to proceed with normal operations at PF-4. DNFSB had previously pointed out to DOE/NNSA the potentially hazardous conditions existing at PF-4. DNFSB may or may not agree with Chu's latest assessment.
........................................................................
25 March 2013 / Acting DOE Sec. Nielie Miller wrote to DNFSB to inform them of the status of upgrades to the criticality safety program and procedures at all of the DOE/NNSA facilities. The problems with criticality safety procedures at Los Alamos National Laboratory (LANL) seem to be the most serious, when compared with the other DOE/NNSA facilities. By contrast, excellent performance, in terms of criticality safety, has been turned in at Lawrence Livermore National Laboratory (LLNL).
........................................................................
DNFSB organized the Pantex Public Meeting, of 14 March, 2013, to inquire into alleged deficiencies in Pantex Plant's safety culture:
Testimony (excerpted) of Ms. Neile Miller
Acting Administrator, National Nuclear Security Administration
& Acting Under Secretary for Nuclear Security /U.S. Department of Energy
To the Defense Nuclear Facilities Safety Board
Pantex Plant Public Meeting
Amarillo Civic Center
401 S. Buchanan Street
Amarillo, TX, 79101
14 March 2013
INTRODUCTION
In my time here with you today, I want to assure you of two things. First, I am fully aware of the significant safety culture concerns that have been raised by our workers here at the Pantex Plant. Second, we are engaged in —and fully committed to — the timely resolution of any and all nuclear safety deficiencies within the Department, be they cultural, managerial, contractual, design, or operational in origin. This holds true across the NNSA as well as the broader DOE complex, including Environmental Management. I reaffirm the Administration’s and the Department’s commitment to safe and secure work environments for all Federal and contractor employees.
BACKGROUND DISCUSSION
As you know, the Office of Health, Safety, and Security (HSS) recently completed an assessment of the safety culture at the Pantex Plant. The results were sobering; so sobering in fact, that my staff immediately convened to discuss options that could be quickly implemented to address these findings, even as we contemplate longer-term actions to fully implement the recommendations from the HSS report
SAFETY CULTURE ACTIONS
Immediately following the briefing by HSS regarding its safety culture findings at Pantex, NNSA issued a letter to Babcock & Wilcox /Pantex directing immediate focus at all management and working levels to a safety conscious work environment (SCWE) for all on-going activities and operations.
CONCLUSION
As an organization tasked with one of the Nation’s most critical missions, we at DOE understand the fundamental, make-or-break challenges that our work entails. The safe and successful execution of our mission greatly affects our Nation’s safety and security, and demands the very best of all of us, year in and year out. That is why it is so important to embed the commitment to safety deeply in the culture of the NNSA enterprise, so that it will be embraced by all those who succeed us. Our safety culture is critical to protecting and improving the NNSA legacy. We must not fail in this effort.
Our commitment to safety is reflected in the personal passion for safety that the Secretary has expressed on several occasions. His message is clear, and my senior managers and I reinforce it whenever we meet with our workers and stakeholders: The Department has an unwavering commitment to maintain safe and secure work environments for all Federal and contractor employees. Furthermore, we will ensure that the Department’s and contractor’s operations do not adversely affect the health, safety, or security of the surrounding communities or the nation.
............................................................................
Letter (paraphrased) from Paul Matney, Ed. D., President of Amarillo College, dated March 7, 2013 to DNFSB:
President Matney describes the great importance of Babcock & Wilcox /Pantex jobs to the Amarillo community. He says that B&W Pantex is the third largest local employer and gives jobs to 3000 local residents. According to Matney, "Pantex Plant and its workers have long been a vital part of the Texas Panhandle community and its mission remains critical to the safety and security of our nation."
............................................................................
Today, the New York Time's Matthew Wald described the continued failure of DOE/NNSA to complete the Hanford, Washington Waste Treatment and Immobilization Plant (WTP) construction project. Currently, it is estimated that this project has been 60% completed, and that its total cost will be in excess of $12 billion. Many problems with the design of WTP have been identified recently, which reflect safety concerns, and required changes to the design may be extensive. Senator Ron Wyden (Dem. Oregon), who chairs the Senate Energy Committee, with DOE oversight responsibility, is focusing his attention on this problem.
........................................................................
1 April 2013 / In a letter, Defense Nuclear Facilities Safety Board (DNFSB) Chairman Peter Winokur reported to U. S. Sen. Ron Wyden about the state of nuclear safety at Hanford Site. Three separate areas of concern were addressed: (1) safety issues associated with the Hanford Tank Farms; (2) unresolved technical matters related to the design of the Waste Treatment and Immobilization Plant (WTP); (3) the current state of Hanford's safety culture. DNFSB performed this study at Sen. Wyden's request.
........................................................................
27 March 2013 / Outgoing DOE Sec. Chu wrote to DNFSB to inform them that the status of the safety upgrade at LANL's PF-4 (Plutonium Facility) has progressed to the extent that he now felt it acceptable to proceed with normal operations at PF-4. DNFSB had previously pointed out to DOE/NNSA the potentially hazardous conditions existing at PF-4. DNFSB may or may not agree with Chu's latest assessment.
........................................................................
25 March 2013 / Acting DOE Sec. Nielie Miller wrote to DNFSB to inform them of the status of upgrades to the criticality safety program and procedures at all of the DOE/NNSA facilities. The problems with criticality safety procedures at Los Alamos National Laboratory (LANL) seem to be the most serious, when compared with the other DOE/NNSA facilities. By contrast, excellent performance, in terms of criticality safety, has been turned in at Lawrence Livermore National Laboratory (LLNL).
........................................................................
DNFSB organized the Pantex Public Meeting, of 14 March, 2013, to inquire into alleged deficiencies in Pantex Plant's safety culture:
Testimony (excerpted) of Ms. Neile Miller
Acting Administrator, National Nuclear Security Administration
& Acting Under Secretary for Nuclear Security /U.S. Department of Energy
To the Defense Nuclear Facilities Safety Board
Pantex Plant Public Meeting
Amarillo Civic Center
401 S. Buchanan Street
Amarillo, TX, 79101
14 March 2013
INTRODUCTION
In my time here with you today, I want to assure you of two things. First, I am fully aware of the significant safety culture concerns that have been raised by our workers here at the Pantex Plant. Second, we are engaged in —and fully committed to — the timely resolution of any and all nuclear safety deficiencies within the Department, be they cultural, managerial, contractual, design, or operational in origin. This holds true across the NNSA as well as the broader DOE complex, including Environmental Management. I reaffirm the Administration’s and the Department’s commitment to safe and secure work environments for all Federal and contractor employees.
BACKGROUND DISCUSSION
As you know, the Office of Health, Safety, and Security (HSS) recently completed an assessment of the safety culture at the Pantex Plant. The results were sobering; so sobering in fact, that my staff immediately convened to discuss options that could be quickly implemented to address these findings, even as we contemplate longer-term actions to fully implement the recommendations from the HSS report
SAFETY CULTURE ACTIONS
Immediately following the briefing by HSS regarding its safety culture findings at Pantex, NNSA issued a letter to Babcock & Wilcox /Pantex directing immediate focus at all management and working levels to a safety conscious work environment (SCWE) for all on-going activities and operations.
CONCLUSION
As an organization tasked with one of the Nation’s most critical missions, we at DOE understand the fundamental, make-or-break challenges that our work entails. The safe and successful execution of our mission greatly affects our Nation’s safety and security, and demands the very best of all of us, year in and year out. That is why it is so important to embed the commitment to safety deeply in the culture of the NNSA enterprise, so that it will be embraced by all those who succeed us. Our safety culture is critical to protecting and improving the NNSA legacy. We must not fail in this effort.
Our commitment to safety is reflected in the personal passion for safety that the Secretary has expressed on several occasions. His message is clear, and my senior managers and I reinforce it whenever we meet with our workers and stakeholders: The Department has an unwavering commitment to maintain safe and secure work environments for all Federal and contractor employees. Furthermore, we will ensure that the Department’s and contractor’s operations do not adversely affect the health, safety, or security of the surrounding communities or the nation.
............................................................................
Letter (paraphrased) from Paul Matney, Ed. D., President of Amarillo College, dated March 7, 2013 to DNFSB:
President Matney describes the great importance of Babcock & Wilcox /Pantex jobs to the Amarillo community. He says that B&W Pantex is the third largest local employer and gives jobs to 3000 local residents. According to Matney, "Pantex Plant and its workers have long been a vital part of the Texas Panhandle community and its mission remains critical to the safety and security of our nation."
............................................................................
Friday, January 18, 2013
NM Coalition Boosts LANL Programs
The Regional Coalition of LANL Communities held its monthly meeting today, Friday, from 9:00 to 11:00 AM, at the Ohkay Owingeh Conference Center, in Española, New Mexico. The meeting was chaired by Alice Lucero, RCLC vice-chairperson and mayor of Española. Attending were ~11 members of RCLC, as well as ~40 non-RCLC members. Mayor Lucero began the meeting by asking each attendee to introduce themself, "in order to see who are the interested parties here." The RCLC, of course, is made up entirely of members of local governments. Making up the audience were a few local anti-nuclear citizen activists, plus a majority of members of groups dependent on the support of state and federal government; e. g., LANL managers, DOE grant recipients, and NMED employees.
The meeting began, oddly, with a statement by an assistant to Juan Griego, the in-coming NNSA site manager at LANL. Mr. Griego thanked the RCLC for its support for his bid for the site manager's job, and expressed his concern for the well-being of each and every citizen of New Mexico. He continued by saying that, however, he would not be able to assume the responsibilities of the site manager's office since he had just accepted a job with the NM National Guard.
Next, RCLC Executive Director De Anza Sapien talked about the RCLC budget for 2013 and about a meeting of the Energy Communities Alliance which she recently attended, along with RCLC chair David Coss, vice-chair Alice Lucero, and RCLC member Fran Berting. Ms. sapiens emphazised that RCLC will try "to get everyone under the tent" when it comes to "supporting the stabilization of funding for LANL". She also announced that the NM State Legislature is issuing a Memorial in support of federal programs in NM. Also, she will ask the State Legislature to advise RCLC on how it may best support future federal funding for LANL.
A representative of Jemez Pueblo reported that she is encouraging more local Pueblos to become members of RCLC.
Alice Lucero said that RCLC should express strong support for all of the facility modernization programs at LANL, in view of the difficulties with funding being experienced recently. She alluded to a RCLC letter to DOE Secretary Steven Chu expressing support for planned LANL modernization programs. Included with this letter, she said, and at the behest of Joni Arends of CCNS, was a copy of a letter sent to Sec. Chu by DNFSB. However, she neglected to describe the substance of the DNFSB letter.
Joni Arends then pointed out that the DNFSB, in their recent letter, questioned the safety of the continued operation of LANL's PF-4 plutonium facility, due to seismic hazards, and in no way could be construed as supporting new construction programs at LANL.
De Anza Sapien said that RCLC must support full funding for the clean up of legacy nuclear waste at LANL (now running at ~$188 million per year.)
LANL environmental managers Peter Maggiore and Jeff Mousseau presented the outline of a formal talk entitled "Fiscal Year 2013 Planning and Continuing the Governor's Priorities." Jeff M. pointed out that TRansUranic (TRU) waste from Area G is being transported to the WIPP site on an expedited scheduled, at the request of the Governor, and as stipulated to by NNSA, LANS and NMED in last year's Framework Agreement. He said that, within the last year, the inventory of above ground TRU waste at Area G has been reduced from 75,000 Plutonium Equivalent Curies (PECi) to 50,000 PECi. This decreases the danger of a dispersal of radioactive materials into the atmosphere in the event of a future wildfire that might pass over Area G. Therefore, at the present rate of removal, all of the above ground TRU waste might be removed within two years. However, he then went on to say that DOE and LANL plan to begin the removal of below ground nuclear waste from Area G; see LA-UR-12-26709.
Although, during his presentation, Jeff M. did not clearly describe the amount of nuclear waste currently held below ground at Area G, he told me later that this was as much as 110,750 PECi. Presumably, since below ground TRU waste must first be transported to an above ground area before it can be shipped off site to WIPP, it will be more than two years before the danger of an atmospheral dispersal of nuclear waste due to wildfire at Area G is eliminated; i.e., ~6 years, at the present rate of TRU waste removal.
[Should it be of concern to the general public that ~100,000 PECi of nuclear waste remains vulnerable to wildfire at Area G? See my blogposts of Nov. 24, 2011, "Accidental Fall-Out from LANL" and Nov. 18, 2011, "DNFSB Criticizes LANL Risky Practices."]
De Anza Sapien pointed out that RCLC wants local young people to be able to work in the LANL clean up program and supports innovative educational efforts targeted toward this goal.
Carla Rachkowski, of Accelerate Technical Training and Job Placement described her group's efforts to improve the rate of graduation of local students working in two year certificate programs; see www.acceleratenm.org.
Lastly, local citizens and citizen activists spoke:
Ray Baca of the Constructions and Trades Union said that he supports the clean up and modernization programs at LANL, and that his union's apprentice program is among the best in the industry.
Joni Arends talked about safety at PF-4 and the related seismic question, and pointed out that DNFSB considers this issue to be of the utmost importance. She also expressed concern about the above ground TRU waste remaining at Area G and about the danger that wildfire presents to this material.
Jean Green of Taos said that since RCLC defines the most important part of its mission as support for the clean up of nuclear waste at LANL, the fact that it also supports facilities modernization programs at LANL is a clear contradiction; i.e., since such programs will lead to the production of new nuclear waste. She also claimed that LANL nuclear and chemical waste has poisoned the environment in northern NM, and has led to an elevated incidence of local cancers.
Melissa .. of Taos asked about the $ cost of removing TRU waste from LANL.
Scott Kovacs said that he supports the LANL clean up program.
Thomas Gomez of NNMCAB announced that the CAB will host a forum at Buffalo Thunder resort, on Jan 30, in which the presence of cancer clusters in northern NM will be discussed.
Holly Beaumont said that NM has the greatest income inequality of any of the 50 states, probably due to an over-dependence on federal employment, with its over-generous compensation; i.e., since federal employees are just a small fraction of the total of NM workers. She then quoted from Samuel Johnson, 18th century essayist, Anglican, and Tory: "The consequence of poverty is dependency." She also warned about the machinations of Bechtel, the leader of the for-profit group, LANS, which manages LANL for the NNSA.
The meeting began, oddly, with a statement by an assistant to Juan Griego, the in-coming NNSA site manager at LANL. Mr. Griego thanked the RCLC for its support for his bid for the site manager's job, and expressed his concern for the well-being of each and every citizen of New Mexico. He continued by saying that, however, he would not be able to assume the responsibilities of the site manager's office since he had just accepted a job with the NM National Guard.
Next, RCLC Executive Director De Anza Sapien talked about the RCLC budget for 2013 and about a meeting of the Energy Communities Alliance which she recently attended, along with RCLC chair David Coss, vice-chair Alice Lucero, and RCLC member Fran Berting. Ms. sapiens emphazised that RCLC will try "to get everyone under the tent" when it comes to "supporting the stabilization of funding for LANL". She also announced that the NM State Legislature is issuing a Memorial in support of federal programs in NM. Also, she will ask the State Legislature to advise RCLC on how it may best support future federal funding for LANL.
A representative of Jemez Pueblo reported that she is encouraging more local Pueblos to become members of RCLC.
Alice Lucero said that RCLC should express strong support for all of the facility modernization programs at LANL, in view of the difficulties with funding being experienced recently. She alluded to a RCLC letter to DOE Secretary Steven Chu expressing support for planned LANL modernization programs. Included with this letter, she said, and at the behest of Joni Arends of CCNS, was a copy of a letter sent to Sec. Chu by DNFSB. However, she neglected to describe the substance of the DNFSB letter.
Joni Arends then pointed out that the DNFSB, in their recent letter, questioned the safety of the continued operation of LANL's PF-4 plutonium facility, due to seismic hazards, and in no way could be construed as supporting new construction programs at LANL.
De Anza Sapien said that RCLC must support full funding for the clean up of legacy nuclear waste at LANL (now running at ~$188 million per year.)
LANL environmental managers Peter Maggiore and Jeff Mousseau presented the outline of a formal talk entitled "Fiscal Year 2013 Planning and Continuing the Governor's Priorities." Jeff M. pointed out that TRansUranic (TRU) waste from Area G is being transported to the WIPP site on an expedited scheduled, at the request of the Governor, and as stipulated to by NNSA, LANS and NMED in last year's Framework Agreement. He said that, within the last year, the inventory of above ground TRU waste at Area G has been reduced from 75,000 Plutonium Equivalent Curies (PECi) to 50,000 PECi. This decreases the danger of a dispersal of radioactive materials into the atmosphere in the event of a future wildfire that might pass over Area G. Therefore, at the present rate of removal, all of the above ground TRU waste might be removed within two years. However, he then went on to say that DOE and LANL plan to begin the removal of below ground nuclear waste from Area G; see LA-UR-12-26709.
Although, during his presentation, Jeff M. did not clearly describe the amount of nuclear waste currently held below ground at Area G, he told me later that this was as much as 110,750 PECi. Presumably, since below ground TRU waste must first be transported to an above ground area before it can be shipped off site to WIPP, it will be more than two years before the danger of an atmospheral dispersal of nuclear waste due to wildfire at Area G is eliminated; i.e., ~6 years, at the present rate of TRU waste removal.
[Should it be of concern to the general public that ~100,000 PECi of nuclear waste remains vulnerable to wildfire at Area G? See my blogposts of Nov. 24, 2011, "Accidental Fall-Out from LANL" and Nov. 18, 2011, "DNFSB Criticizes LANL Risky Practices."]
De Anza Sapien pointed out that RCLC wants local young people to be able to work in the LANL clean up program and supports innovative educational efforts targeted toward this goal.
Carla Rachkowski, of Accelerate Technical Training and Job Placement described her group's efforts to improve the rate of graduation of local students working in two year certificate programs; see www.acceleratenm.org.
Lastly, local citizens and citizen activists spoke:
Ray Baca of the Constructions and Trades Union said that he supports the clean up and modernization programs at LANL, and that his union's apprentice program is among the best in the industry.
Joni Arends talked about safety at PF-4 and the related seismic question, and pointed out that DNFSB considers this issue to be of the utmost importance. She also expressed concern about the above ground TRU waste remaining at Area G and about the danger that wildfire presents to this material.
Jean Green of Taos said that since RCLC defines the most important part of its mission as support for the clean up of nuclear waste at LANL, the fact that it also supports facilities modernization programs at LANL is a clear contradiction; i.e., since such programs will lead to the production of new nuclear waste. She also claimed that LANL nuclear and chemical waste has poisoned the environment in northern NM, and has led to an elevated incidence of local cancers.
Melissa .. of Taos asked about the $ cost of removing TRU waste from LANL.
Scott Kovacs said that he supports the LANL clean up program.
Thomas Gomez of NNMCAB announced that the CAB will host a forum at Buffalo Thunder resort, on Jan 30, in which the presence of cancer clusters in northern NM will be discussed.
Holly Beaumont said that NM has the greatest income inequality of any of the 50 states, probably due to an over-dependence on federal employment, with its over-generous compensation; i.e., since federal employees are just a small fraction of the total of NM workers. She then quoted from Samuel Johnson, 18th century essayist, Anglican, and Tory: "The consequence of poverty is dependency." She also warned about the machinations of Bechtel, the leader of the for-profit group, LANS, which manages LANL for the NNSA.
Wednesday, January 9, 2013
NNSA: 1% of Budget Reduces US Nuke Number
As the new year begins, federal budgets for FY2013, passed by the previous Congress, are being signed into law by the President. Although a few federal programs will shrink, NNSA's budget for FY2013 will increase by 4.9% to approximately $11.5 billion. Quoting from NNSA's website (http://nnsa.energy.gov/aboutus/budget), these monies will be allocated as follows:
"The FY 2013 budget provides $7.58 billion to implement the President’s strategy for the stewardship of the nuclear weapons stockpile in coordination with our partners at the Department of Defense. It includes $2.24 billion for facility operation and maintenance, and construction projects, helping NNSA modernize Cold War-era facilities, with increases are requested for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex and the TRU Waste Facility at Los Alamos National Laboratory (LANL)."
"$51.3 million is provided in FY 2013 to continue reducing the number of nuclear weapons in the United States’ stockpile. NNSA has committed to completing the dismantlement of all warheads retired as of FY 2009 by FY 2022. In FY 2011, NNSA completed the dismantlement of the last B53 nuclear bomb, one of the largest ever built, ahead of schedule and under budget. NNSA also eliminated the W70, the last warhead in the US Army’s arsenal."
"$2.46 billion is requested to help achieve the President’s nonproliferation objectives and NNSA works toward meeting his four-year goal to secure vulnerable nuclear material around the world. This funding will help complete the removal or disposal of 4,353 kilograms of highly enriched uranium and plutonium in foreign countries, and provide NNSA with the necessary support to equip approximately 229 total buildings containing weapons-usable material with state-of-the-art security upgrades by the President’s deadline."
"The President also continued to request funding for the Mixed Oxide (MOX) Fuel Fabrication Facility and Waste Solidification Building at the Savannah River Site, critical nonproliferation construction projects. The $569.5 million requested for MOX and related activities this year will lead to the permanent elimination of enough plutonium for at least 8,500 nuclear weapons."
"The FY 2013 budget request gives NNSA the resources needed to maintain its one-of-a-kind emergency response capabilities, which allow NNSA to respond to a nuclear or radiological incident anywhere in the world. In FY 2011, NNSA was able to assist the U.S. military, military families, and the Japanese people by deploying its unique emergency response assets in the aftermath of devastating tsunami that affected the Fukushima Daiichi Nuclear Power Plant."
"To power the nuclear navy, the budget request includes $1.1 billion for the Naval Reactors program, which will support the OHIO class submarine replacement and modernize key elements NNSA’s infrastructure."
(These separate allocations sum to $11.76 billion.)
It may be of interest to note that NNSA's FY2013 budget provides just $51.3 million "to continue reducing the number of nuclear weapons in the United States’ stockpile", but $7.58 billion to "implement the President’s strategy for the stewardship of the nuclear weapons stockpile in coordination with our partners at the Department of Defense"; i.e., the amount of money assigned to maintain and/or improve the current nuclear weapons stockpile is 148x greater than the amount of money assigned to reducing the size of the stockpile.
Meanwhile, $2.46 billion is assigned to the nuclear non-proliferation program and $569 million "for MOX and related activities"; but, the MOX program, as advertised, is itself a non-proliferation activity.
No money is assigned by NNSA to the cleanup of legacy nuclear waste; i.e., nuclear wastes which are a legacy of the nuclear weapons program. Rather, this is included as a $5.65 billion line item in DOE's $27.45 billion budget for FY2013. The itemized DOE budget for FY2013 is compared with its budgets for the two preceding years at http://www.whitehouse.gov/sites/default/files/omb/budget/fy2013/assets/energy.pdf. Money assigned to the cleanup of legacy nuclear waste will be 1.1% less than in FY2012. DOE's total (discretionary) budget will increase by 3.2% relative to FY2012.
It is curious that Sec. of Energy Steven Chu, in his public remarks, dated Dec 21, 2012, celebrating the career of retiring NNSA chief administrator Tom D'Agostino, said (see Press Release section of NNSA's website):
"Under his [D'Agostino's] watch, we have eliminated or secured hundreds of nuclear weapons worth of nuclear materials. We have reduced the number of deployed warheads to the lowest level since the 1950s—an approximate reduction of 85% from the darkest days of the Cold War – while successfully maintaining the safety, security, and effectiveness of a shrinking stockpile. Through Environmental Management, we have permanently cleaned up 690 square miles of contaminated land—an area more than 30 times the size of Manhattan—and completed the cleanup of 22 transuranic waste sites across the nation, permanently eliminating an environmental risk at these sites and reducing the cost of monitoring and storing this waste."
But, Sec. Chu chose here to mention only those NNSA operations that tend to "reduce nuclear dangers at home and abroad" by shrinking the size of the nuclear weapons stockpile, even though this is only 1% of NNSA's annual budget. Moreover, the cleanup of lands contaminated by the accumulated detritus of the nuclear weapons program, to which he referred, is a DOE, but not an NNSA, responsibility. Oddly, too, Chu referred only indirectly to the dominant part of NNSA's current mission which is to "maintain the safety, security, and effectiveness of the remaining weapons"; i.e., the Stockpile Stewardship Program, which eats up 2/3 of NNSA's annual budget.
"The FY 2013 budget provides $7.58 billion to implement the President’s strategy for the stewardship of the nuclear weapons stockpile in coordination with our partners at the Department of Defense. It includes $2.24 billion for facility operation and maintenance, and construction projects, helping NNSA modernize Cold War-era facilities, with increases are requested for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex and the TRU Waste Facility at Los Alamos National Laboratory (LANL)."
"$51.3 million is provided in FY 2013 to continue reducing the number of nuclear weapons in the United States’ stockpile. NNSA has committed to completing the dismantlement of all warheads retired as of FY 2009 by FY 2022. In FY 2011, NNSA completed the dismantlement of the last B53 nuclear bomb, one of the largest ever built, ahead of schedule and under budget. NNSA also eliminated the W70, the last warhead in the US Army’s arsenal."
"$2.46 billion is requested to help achieve the President’s nonproliferation objectives and NNSA works toward meeting his four-year goal to secure vulnerable nuclear material around the world. This funding will help complete the removal or disposal of 4,353 kilograms of highly enriched uranium and plutonium in foreign countries, and provide NNSA with the necessary support to equip approximately 229 total buildings containing weapons-usable material with state-of-the-art security upgrades by the President’s deadline."
"The President also continued to request funding for the Mixed Oxide (MOX) Fuel Fabrication Facility and Waste Solidification Building at the Savannah River Site, critical nonproliferation construction projects. The $569.5 million requested for MOX and related activities this year will lead to the permanent elimination of enough plutonium for at least 8,500 nuclear weapons."
"The FY 2013 budget request gives NNSA the resources needed to maintain its one-of-a-kind emergency response capabilities, which allow NNSA to respond to a nuclear or radiological incident anywhere in the world. In FY 2011, NNSA was able to assist the U.S. military, military families, and the Japanese people by deploying its unique emergency response assets in the aftermath of devastating tsunami that affected the Fukushima Daiichi Nuclear Power Plant."
"To power the nuclear navy, the budget request includes $1.1 billion for the Naval Reactors program, which will support the OHIO class submarine replacement and modernize key elements NNSA’s infrastructure."
(These separate allocations sum to $11.76 billion.)
It may be of interest to note that NNSA's FY2013 budget provides just $51.3 million "to continue reducing the number of nuclear weapons in the United States’ stockpile", but $7.58 billion to "implement the President’s strategy for the stewardship of the nuclear weapons stockpile in coordination with our partners at the Department of Defense"; i.e., the amount of money assigned to maintain and/or improve the current nuclear weapons stockpile is 148x greater than the amount of money assigned to reducing the size of the stockpile.
Meanwhile, $2.46 billion is assigned to the nuclear non-proliferation program and $569 million "for MOX and related activities"; but, the MOX program, as advertised, is itself a non-proliferation activity.
No money is assigned by NNSA to the cleanup of legacy nuclear waste; i.e., nuclear wastes which are a legacy of the nuclear weapons program. Rather, this is included as a $5.65 billion line item in DOE's $27.45 billion budget for FY2013. The itemized DOE budget for FY2013 is compared with its budgets for the two preceding years at http://www.whitehouse.gov/sites/default/files/omb/budget/fy2013/assets/energy.pdf. Money assigned to the cleanup of legacy nuclear waste will be 1.1% less than in FY2012. DOE's total (discretionary) budget will increase by 3.2% relative to FY2012.
It is curious that Sec. of Energy Steven Chu, in his public remarks, dated Dec 21, 2012, celebrating the career of retiring NNSA chief administrator Tom D'Agostino, said (see Press Release section of NNSA's website):
"Under his [D'Agostino's] watch, we have eliminated or secured hundreds of nuclear weapons worth of nuclear materials. We have reduced the number of deployed warheads to the lowest level since the 1950s—an approximate reduction of 85% from the darkest days of the Cold War – while successfully maintaining the safety, security, and effectiveness of a shrinking stockpile. Through Environmental Management, we have permanently cleaned up 690 square miles of contaminated land—an area more than 30 times the size of Manhattan—and completed the cleanup of 22 transuranic waste sites across the nation, permanently eliminating an environmental risk at these sites and reducing the cost of monitoring and storing this waste."
But, Sec. Chu chose here to mention only those NNSA operations that tend to "reduce nuclear dangers at home and abroad" by shrinking the size of the nuclear weapons stockpile, even though this is only 1% of NNSA's annual budget. Moreover, the cleanup of lands contaminated by the accumulated detritus of the nuclear weapons program, to which he referred, is a DOE, but not an NNSA, responsibility. Oddly, too, Chu referred only indirectly to the dominant part of NNSA's current mission which is to "maintain the safety, security, and effectiveness of the remaining weapons"; i.e., the Stockpile Stewardship Program, which eats up 2/3 of NNSA's annual budget.
Sunday, December 2, 2012
MOX Musings
How to dispose of more than 33 tons of fissile plutonium (P239), declared surplus from the nuclear weapons program?
Is it better to mix it with depleted uranium (U238), form the mixture into fuel rods (MOX), burn the fuel in civilian nuclear reactors, and then bury the exhausted, but still radioactive fuel in a deep pit for a very long time, essentially forever?
Or, is it better to combine the surplus Pu239 with waste from nuclear power plants, vitrify the highly radioactive mixture steel canisters, and then bury the canisters in a deep pit for a very long time, essentially forever?
Are either of these schemes guaranteed to permanently dispose of the surplus Pu239; i.e., such that it would be forever impossible to build a viable nuclear warhead from the nuclear wastes?
Well, maybe not! But, in this regard, details matter and much of the relevant information is classified as Secret Restricted Data; e.g., just what can be constructed successfully from waste materials of a given nuclidic composition is unknown to the general public.
........................................................................................
Nevertheless, advocacy groups vouchsafe a variety of views on this topic. Across the spectrum of views there are, on the one hand, views associated with pessimistic feelings about nuclear energy and, on the other, views associated with optimistic feelings about all things nuclear. Those who feel pessimistic about nuclear energy occasionally also express negative thoughts about other human attempts to control and exploit nature. Those who feel optimistic about all things nuclear also often express positive thoughts about scientific and engineering undertakings, generally.
Thus, do I reveal some of my own bias!
Now, a few quotes from websites advocating for and against MOX:
........................................................................................
From Nuclear Information and Resource Service (an antinuclear activist group):
http://www.nirs.org/factsheets/moxproliferation.htm
Plutonium Proliferation and MOX Fuel
The Department of Energy’s (DOE) decision to mix 33 or more metric tons of plutonium from nuclear weapons with depleted uranium into a mixed-oxide fuel for use in commercial nuclear reactors is a direct reversal of decades-old U.S. policy aimed toward non-proliferation of nuclear weapons materials. A plutonium fuel program will increase the risks of nuclear terrorism and the international proliferation of plutonium.
A decision on the part of the U.S. government to engage in a large scale civilian plutonium program would encourage the continuation of the messy and dangerous reprocessing programs in Europe and Japan. A plutonium fuel program would destroy any leverage the U.S. might have to influence non-weapons states from creating their own civilian reprocessing programs.
Irradiating weapons plutonium in a reactor does not make the plutonium unusable for weapons purposes. The U.S. government proved with a nuclear test in 1962 that so-called "reactor grade" plutonium can be used in nuclear bombs. Using weapons grade plutonium in reactors does not effectively safeguard plutonium, and it undermines disarmament efforts.
A U.S. plutonium fuel program would send a clear signal to other countries: the U.S. government approves of separated plutonium fuel programs. This would undercut the government's ability to discourage reprocessing in other countries and may encourage other countries to pursue plutonium programs. Arms Control and Disarmament Agency Director John Holum explained the situation clearly in a memorandum to former Energy Secretary Hazel O'Leary: "U.S. decisions on plutonium disposition are inextricably linked with U.S. efforts to reduce stockpiles as well as limit the use of plutonium worldwide. The multi-decade institutionalization of plutonium use in US commercial reactors would set a very damaging precedent for US non-proliferation policy."
The alternative, to encase the plutonium in ceramics or glass (immobilization), will not affect the government's non-proliferation goals, nor encourage civilian reprocessing in the U.S. or elsewhere. Immobilizing plutonium will send the proper signal that plutonium is a dangerous waste and needs to be treated as such.
...........................................................................................
From the National Nuclear Security Administration:
NNSA Completes Milestones for Initial Steps in Plutonium Disposition
Nov 16, 2012
WASHINGTON, D.C. – The National Nuclear Security Administration (NNSA) has announced that it recently completed two milestones towards production of early plutonium oxide feedstock for its Mixed Oxide (MOX) Fuel Fabrication Facility. In its second year in production, NNSA exceeded the FY 2012 goal of 200 kilograms of plutonium oxide production by disassembling nuclear weapons pits and converting them into plutonium oxide at Los Alamos National Laboratory (LANL). NNSA also initiated operations at H-Canyon and HB-Line at the Savannah River Site (SRS) to begin plutonium oxide production. The oxide production at both LANL and SRS provides the initial feedstock for the MOX facility and demonstrates the first steps towards permanent plutonium disposition.
“The progress achieved at LANL and SRS in support of plutonium disposition demonstrates the benefits of utilizing existing facilities in support of NNSA’s efforts to eliminate surplus weapons plutonium,” said NNSA Administrator Thomas D’Agostino.
“Feedstock for the MOX facility represents a critical component of the U.S. plutonium disposition strategy and will enable the U.S. to meet international nonproliferation commitments while advancing President Obama’s goal of permanently reducing the number of nuclear weapons across the globe.”
The disassembly, conversion and certification, which were completed at LANL, are significant accomplishments in an ongoing effort to safely dispose of surplus weapon-grade plutonium. NNSA used the Advanced Recovery and Integrated Extraction System (ARIES) at LANL to prepare, package and certify the plutonium oxide product. Following a rigorous product certification process, Shaw AREVA MOX Services, the prime contractor for the design, construction and start-up of the MOX facility, has officially accepted a total of 442 kilograms of plutonium oxide from LANL for the MOX facility.
Savannah River Nuclear Solutions (SRNS) initiated repackaging and dissolution of the non-pit plutonium material in H-Canyon this month, marking a significant milestone for H-Canyon's efforts to support the mission to produce early feed for the MOX facility. The H-Canyon Complex will eventually provide approximately 3.7 metric tons (MT) of plutonium oxide feedstock for the MOX Fuel Fabrication Facility from the excess defense plutonium currently stored at SRS.
Under an agreement between NNSA and the Department of Energy’s Office of Environmental Management (EM), the SRS H-Canyon and HB-Line, which are owned by EM and operated by the SRS management contractor SRNS, will process plutonium to meet the specifications for use in the MOX facility. Use of the SRS’s HB-Line and H-Canyon, the only operating production-scale, shielded chemical separation facilities in the U.S., takes advantage of the extensive plutonium experience among SRNS’s H-Canyon and HB-Line staff and allows for the conversion of this plutonium into feed material that will be readily available for the MOX facility’s first years of operation. The successful startup of the dissolution process is a key milestone in preparing the materials for conversion to MOX fuel.
Through the Plutonium Management and Disposition Agreement, the U.S. and Russia have agreed to each dispose of at least 34 MT of surplus weapon-grade plutonium, enough total material for 17,000 nuclear weapons. Once at the MOX facility, the plutonium oxide from LANL along with the oxide already at SRS from H-Canyon will be blended with depleted uranium, fabricated into MOX fuel and irradiated in domestic nuclear power reactors. After the MOX fuel is irradiated in civilian reactors, it is no longer suitable for use in nuclear weapons. [A question still remains as to whether or not a crude nuclear device could be fashioned successfully from MOX fuel that had been irradiated in civilian reactors.]
..........................................................................................
Also of interest is a related topic, presented by a well-known nuclear policy expert:
Op-Ed Contributor / New York Times
Japan’s Nuclear Mistake
By FRANK N. VON HIPPEL and MASAFUMI TAKUBO
November 28, 2012
THIS year has seen a lot of concern about the confrontation between China and Japan over a group of islets in the East China Sea.
Less attention, though, is being paid to what may be a more destabilizing development: next year Japan plans to bring its long-delayed Rokkasho reprocessing plant online, which could extract as much as eight tons of weapons-usable plutonium from spent reactor fuel a year, enough for nearly 1,000 warheads. That would add to Japan’s existing stockpile of 44 tons, 9 of which are stored in domestic facilities.
Japan has repeatedly vowed never to develop nuclear weapons, and there’s no reason to doubt that now. But there’s more to worry about: reprocessing not only creates a tempting target for terrorists, it also sets a precedent for countries around the world to follow suit — and pushes the world toward rampant nuclear proliferation.
Originally, Japan, like other countries, considered the reprocessing of spent nuclear fuel necessary to obtain start-up plutonium for a new generation of plutonium “breeder” reactors that would use uranium more efficiently. But uranium remains cheap and abundant, and the planned reactors, so-called molten-sodium-cooled breeders, proved to be costly and unreliable.
Japan’s own Monju prototype breeder reactor operated for only four months in 1995 before a sodium fire shut it down. Its operators are still struggling to restart it.
Japan then shifted to a strategy of recycling separated plutonium back into the fuel of its existing reactors. That effort was delayed by technical problems and public opposition and, in the wake of last year’s Fukushima accident, appears completely unviable. Still, Japan continues to plan to reprocess its nuclear fuel.
And it does so despite international pressure. At a nuclear-security event in Seoul, South Korea, last March, President Obama said, “We simply can’t go on accumulating huge amounts of the very material, like separated plutonium, that we are trying to keep away from terrorists.”
Not only did Japanese authorities ignore him, but some reprocessing advocates claim that the Obama administration in fact supports Japan’s plutonium recycling program.
Japan insists that its stockpiles are safe, but just one successful theft by would-be nuclear terrorists would create a global crisis. Of even more concern is how reprocessing provides cover for other countries to acquire a nuclear option.
We learned this in 1974 when India took plutonium enriched with help from the American Atoms for Peace program and used it for “peaceful nuclear explosion.”
Thanks to sustained diplomatic efforts, starting with Secretary of State Henry A. Kissinger, and to the high cost of reprocessing, Japan is the only non-nuclear state that continues to reprocess its nuclear fuel. South Korea is insisting, however, in its negotiation of a new Agreement of Nuclear Cooperation with the United States, that it should have the same right to reprocess as Japan.
South Korea isn’t alone. South Africa’s energy minister recently reasserted her country’s interest in reprocessing. When asked
why the country would want to embark on such a costly venture, a South African nuclear official once responded, “Reprocessing is the currency of power in the modern world!” Meanwhile, Iran insists that it has the same rights as Japan and is building a reactor similar to the one India used to produce the plutonium for its first nuclear bombs.
Despite the added cost of reprocessing — about $2.5 billion a year for the new facility — Japan insists it is the only viable option for the spent nuclear fuel which is filling up the cooling pools at its reactors. But there are easier alternatives.
When nuclear power plants in most other countries need space in their pools, they remove some of the older, cooler fuel and place it in air-cooled casks within the plant’s security perimeter. That costs 5 percent as much as reprocessing does. Eventually, the spent fuel is to be shipped to an underground repository, as is to be done with the high-level radioactive waste from reprocessing.
Reprocessing advocates in Japan and South Korea say that communities around the nuclear power plants will not allow dry-cask
storage and that, when the spent fuel pools fill up, the power plants will have to shut down.
But in both countries those local governments receive large subsidies and taxes — typically 50 percent of a municipality’s revenue in Japan — for playing host to nuclear power plants. They are unlikely to force permanent shutdowns just because they don’t like extra spent fuel kept at the reactor site, especially if the safety advantages of dry-cask storage are explained to them.
The Obama administration should make it emphatically clear to Japan’s government that the separation of more plutonium is in no one’s interest. The two countries should instead jointly lead a global effort to reduce existing stocks of separated plutonium by discouraging reprocessing and encouraging safe disposal of already separated stocks, which could be done, for example, by immobilizing the plutonium and placing it in three-mile-deep boreholes.
The waste of trillions of taxpayers’ yen is Japan’s problem. The risk it presents, however, is the whole world’s concern.
Frank N. von Hippel is a professor of public and international affairs at Princeton. Masafumi Takubo is a nuclear policy analyst based in Japan.
..............................................................................
Other relevant info is available from the Nuclear Regulatory Commission:
Storage of Spent Nuclear Fuel in Pools and Dry Casks
Radioactive Waste: Production, Storage, Disposal
Materials Safeguards and Threat Assessment
Transportation of Spent Nuclear Fuel
Locations of Independent Spent Fuel Storage Installations
Dry Spent Fuel Storage Designs: NRC Approved for General Use
Nuclear Fuel Pool Capacity
What We Regulate
There are two acceptable storage methods for spent fuel after it is removed from the reactor core:
Spent Fuel Pools - Currently, most spent nuclear fuel is safely stored in specially designed pools at individual reactor sites around the country.
Dry Cask Storage - If pool capacity is reached, licensees may move toward use of above-ground dry storage casks.
For additional information, see our Spent Fuel Storage in Pools and Dry Casks, Key Points and Questions & Answers page.
How We Regulate
The NRC regulates spent fuel through a combination of regulatory requirements, licensing; safety oversight, including inspection, assessment of performance; and enforcement; operational experience evaluation; and regulatory support activities.
For general information, see the How We Regulate page. For details, see the following:
Regulations, Guidance, and Communications
Licensing
Oversight
Public Involvement
Waste Confidence
Page Last Reviewed/Updated Thursday, October 18, 2012
.............................................................................
Finally, from the World Nuclear Association / Representing the people and organizations of the global nuclear alliance (a nuclear trade association)
Megatons to Megawatts / Military Warheads as a Source of Nuclear Fuel (last updated Aug, 2011)
• Weapons-grade uranium and plutonium surplus to military requirements in the USA and Russia is being made available for use as civil fuel.
• Weapons-grade uranium is highly enriched, to over 90% U-235 (the fissile isotope). Weapons-grade plutonium has over 93% Pu-239 and can be used, like reactor-grade plutonium, in fuel for electricity production.
• Highly-enriched uranium from weapons stockpiles is displacing some 10,600 tonnes of U3O8 production from mines each year, and meets about 13% of world reactor requirements.
For more than three decades concern has centered on the possibility that uranium intended for commercial nuclear power might be diverted for use in weapons. Today, however, attention is focused on the role of military uranium as a major source of fuel for commercial nuclear power.
Since 1987 the United States and countries of the former USSR have signed a series of disarmament treaties to reduce the nuclear arsenals by about 80%.
Nuclear materials declared surplus to military requirements by the USA and Russia are now being converted into fuel for commercial nuclear reactors. The main material is highly enriched uranium (HEU), containing at least 20% uranium-235 (U-235) and usually about 90% U-235. HEU can be blended down with uranium containing low levels of U-235 to produce low enriched uranium (LEU), typically less than 5% U-235, fuel for power reactors. It is blended with depleted uranium (mostly U-238), natural uranium (0.7% U-235), or partially-enriched uranium.
Highly-enriched uranium in US and Russian weapons and other military stockpiles amounts to about 2000 tonnes, equivalent to about twelve times annual world mine production.
World stockpiles of weapons-grade plutonium are reported to be some 260 tonnes, which if used in mixed oxide fuel in conventional reactors would be equivalent to a little over one year's world uranium production. Military plutonium can blended with uranium oxide to form mixed oxide (MOX) fuel.
After LEU or MOX is burned in power reactors, the spent fuel is not suitable for weapons manufacture.
.............................................................................
Any questions?!
Is it better to mix it with depleted uranium (U238), form the mixture into fuel rods (MOX), burn the fuel in civilian nuclear reactors, and then bury the exhausted, but still radioactive fuel in a deep pit for a very long time, essentially forever?
Or, is it better to combine the surplus Pu239 with waste from nuclear power plants, vitrify the highly radioactive mixture steel canisters, and then bury the canisters in a deep pit for a very long time, essentially forever?
Are either of these schemes guaranteed to permanently dispose of the surplus Pu239; i.e., such that it would be forever impossible to build a viable nuclear warhead from the nuclear wastes?
Well, maybe not! But, in this regard, details matter and much of the relevant information is classified as Secret Restricted Data; e.g., just what can be constructed successfully from waste materials of a given nuclidic composition is unknown to the general public.
........................................................................................
Nevertheless, advocacy groups vouchsafe a variety of views on this topic. Across the spectrum of views there are, on the one hand, views associated with pessimistic feelings about nuclear energy and, on the other, views associated with optimistic feelings about all things nuclear. Those who feel pessimistic about nuclear energy occasionally also express negative thoughts about other human attempts to control and exploit nature. Those who feel optimistic about all things nuclear also often express positive thoughts about scientific and engineering undertakings, generally.
Thus, do I reveal some of my own bias!
Now, a few quotes from websites advocating for and against MOX:
........................................................................................
From Nuclear Information and Resource Service (an antinuclear activist group):
http://www.nirs.org/factsheets/moxproliferation.htm
Plutonium Proliferation and MOX Fuel
The Department of Energy’s (DOE) decision to mix 33 or more metric tons of plutonium from nuclear weapons with depleted uranium into a mixed-oxide fuel for use in commercial nuclear reactors is a direct reversal of decades-old U.S. policy aimed toward non-proliferation of nuclear weapons materials. A plutonium fuel program will increase the risks of nuclear terrorism and the international proliferation of plutonium.
A decision on the part of the U.S. government to engage in a large scale civilian plutonium program would encourage the continuation of the messy and dangerous reprocessing programs in Europe and Japan. A plutonium fuel program would destroy any leverage the U.S. might have to influence non-weapons states from creating their own civilian reprocessing programs.
Irradiating weapons plutonium in a reactor does not make the plutonium unusable for weapons purposes. The U.S. government proved with a nuclear test in 1962 that so-called "reactor grade" plutonium can be used in nuclear bombs. Using weapons grade plutonium in reactors does not effectively safeguard plutonium, and it undermines disarmament efforts.
A U.S. plutonium fuel program would send a clear signal to other countries: the U.S. government approves of separated plutonium fuel programs. This would undercut the government's ability to discourage reprocessing in other countries and may encourage other countries to pursue plutonium programs. Arms Control and Disarmament Agency Director John Holum explained the situation clearly in a memorandum to former Energy Secretary Hazel O'Leary: "U.S. decisions on plutonium disposition are inextricably linked with U.S. efforts to reduce stockpiles as well as limit the use of plutonium worldwide. The multi-decade institutionalization of plutonium use in US commercial reactors would set a very damaging precedent for US non-proliferation policy."
The alternative, to encase the plutonium in ceramics or glass (immobilization), will not affect the government's non-proliferation goals, nor encourage civilian reprocessing in the U.S. or elsewhere. Immobilizing plutonium will send the proper signal that plutonium is a dangerous waste and needs to be treated as such.
...........................................................................................
From the National Nuclear Security Administration:
NNSA Completes Milestones for Initial Steps in Plutonium Disposition
Nov 16, 2012
WASHINGTON, D.C. – The National Nuclear Security Administration (NNSA) has announced that it recently completed two milestones towards production of early plutonium oxide feedstock for its Mixed Oxide (MOX) Fuel Fabrication Facility. In its second year in production, NNSA exceeded the FY 2012 goal of 200 kilograms of plutonium oxide production by disassembling nuclear weapons pits and converting them into plutonium oxide at Los Alamos National Laboratory (LANL). NNSA also initiated operations at H-Canyon and HB-Line at the Savannah River Site (SRS) to begin plutonium oxide production. The oxide production at both LANL and SRS provides the initial feedstock for the MOX facility and demonstrates the first steps towards permanent plutonium disposition.
“The progress achieved at LANL and SRS in support of plutonium disposition demonstrates the benefits of utilizing existing facilities in support of NNSA’s efforts to eliminate surplus weapons plutonium,” said NNSA Administrator Thomas D’Agostino.
“Feedstock for the MOX facility represents a critical component of the U.S. plutonium disposition strategy and will enable the U.S. to meet international nonproliferation commitments while advancing President Obama’s goal of permanently reducing the number of nuclear weapons across the globe.”
The disassembly, conversion and certification, which were completed at LANL, are significant accomplishments in an ongoing effort to safely dispose of surplus weapon-grade plutonium. NNSA used the Advanced Recovery and Integrated Extraction System (ARIES) at LANL to prepare, package and certify the plutonium oxide product. Following a rigorous product certification process, Shaw AREVA MOX Services, the prime contractor for the design, construction and start-up of the MOX facility, has officially accepted a total of 442 kilograms of plutonium oxide from LANL for the MOX facility.
Savannah River Nuclear Solutions (SRNS) initiated repackaging and dissolution of the non-pit plutonium material in H-Canyon this month, marking a significant milestone for H-Canyon's efforts to support the mission to produce early feed for the MOX facility. The H-Canyon Complex will eventually provide approximately 3.7 metric tons (MT) of plutonium oxide feedstock for the MOX Fuel Fabrication Facility from the excess defense plutonium currently stored at SRS.
Under an agreement between NNSA and the Department of Energy’s Office of Environmental Management (EM), the SRS H-Canyon and HB-Line, which are owned by EM and operated by the SRS management contractor SRNS, will process plutonium to meet the specifications for use in the MOX facility. Use of the SRS’s HB-Line and H-Canyon, the only operating production-scale, shielded chemical separation facilities in the U.S., takes advantage of the extensive plutonium experience among SRNS’s H-Canyon and HB-Line staff and allows for the conversion of this plutonium into feed material that will be readily available for the MOX facility’s first years of operation. The successful startup of the dissolution process is a key milestone in preparing the materials for conversion to MOX fuel.
Through the Plutonium Management and Disposition Agreement, the U.S. and Russia have agreed to each dispose of at least 34 MT of surplus weapon-grade plutonium, enough total material for 17,000 nuclear weapons. Once at the MOX facility, the plutonium oxide from LANL along with the oxide already at SRS from H-Canyon will be blended with depleted uranium, fabricated into MOX fuel and irradiated in domestic nuclear power reactors. After the MOX fuel is irradiated in civilian reactors, it is no longer suitable for use in nuclear weapons. [A question still remains as to whether or not a crude nuclear device could be fashioned successfully from MOX fuel that had been irradiated in civilian reactors.]
..........................................................................................
Also of interest is a related topic, presented by a well-known nuclear policy expert:
Op-Ed Contributor / New York Times
Japan’s Nuclear Mistake
By FRANK N. VON HIPPEL and MASAFUMI TAKUBO
November 28, 2012
THIS year has seen a lot of concern about the confrontation between China and Japan over a group of islets in the East China Sea.
Less attention, though, is being paid to what may be a more destabilizing development: next year Japan plans to bring its long-delayed Rokkasho reprocessing plant online, which could extract as much as eight tons of weapons-usable plutonium from spent reactor fuel a year, enough for nearly 1,000 warheads. That would add to Japan’s existing stockpile of 44 tons, 9 of which are stored in domestic facilities.
Japan has repeatedly vowed never to develop nuclear weapons, and there’s no reason to doubt that now. But there’s more to worry about: reprocessing not only creates a tempting target for terrorists, it also sets a precedent for countries around the world to follow suit — and pushes the world toward rampant nuclear proliferation.
Originally, Japan, like other countries, considered the reprocessing of spent nuclear fuel necessary to obtain start-up plutonium for a new generation of plutonium “breeder” reactors that would use uranium more efficiently. But uranium remains cheap and abundant, and the planned reactors, so-called molten-sodium-cooled breeders, proved to be costly and unreliable.
Japan’s own Monju prototype breeder reactor operated for only four months in 1995 before a sodium fire shut it down. Its operators are still struggling to restart it.
Japan then shifted to a strategy of recycling separated plutonium back into the fuel of its existing reactors. That effort was delayed by technical problems and public opposition and, in the wake of last year’s Fukushima accident, appears completely unviable. Still, Japan continues to plan to reprocess its nuclear fuel.
And it does so despite international pressure. At a nuclear-security event in Seoul, South Korea, last March, President Obama said, “We simply can’t go on accumulating huge amounts of the very material, like separated plutonium, that we are trying to keep away from terrorists.”
Not only did Japanese authorities ignore him, but some reprocessing advocates claim that the Obama administration in fact supports Japan’s plutonium recycling program.
Japan insists that its stockpiles are safe, but just one successful theft by would-be nuclear terrorists would create a global crisis. Of even more concern is how reprocessing provides cover for other countries to acquire a nuclear option.
We learned this in 1974 when India took plutonium enriched with help from the American Atoms for Peace program and used it for “peaceful nuclear explosion.”
Thanks to sustained diplomatic efforts, starting with Secretary of State Henry A. Kissinger, and to the high cost of reprocessing, Japan is the only non-nuclear state that continues to reprocess its nuclear fuel. South Korea is insisting, however, in its negotiation of a new Agreement of Nuclear Cooperation with the United States, that it should have the same right to reprocess as Japan.
South Korea isn’t alone. South Africa’s energy minister recently reasserted her country’s interest in reprocessing. When asked
why the country would want to embark on such a costly venture, a South African nuclear official once responded, “Reprocessing is the currency of power in the modern world!” Meanwhile, Iran insists that it has the same rights as Japan and is building a reactor similar to the one India used to produce the plutonium for its first nuclear bombs.
Despite the added cost of reprocessing — about $2.5 billion a year for the new facility — Japan insists it is the only viable option for the spent nuclear fuel which is filling up the cooling pools at its reactors. But there are easier alternatives.
When nuclear power plants in most other countries need space in their pools, they remove some of the older, cooler fuel and place it in air-cooled casks within the plant’s security perimeter. That costs 5 percent as much as reprocessing does. Eventually, the spent fuel is to be shipped to an underground repository, as is to be done with the high-level radioactive waste from reprocessing.
Reprocessing advocates in Japan and South Korea say that communities around the nuclear power plants will not allow dry-cask
storage and that, when the spent fuel pools fill up, the power plants will have to shut down.
But in both countries those local governments receive large subsidies and taxes — typically 50 percent of a municipality’s revenue in Japan — for playing host to nuclear power plants. They are unlikely to force permanent shutdowns just because they don’t like extra spent fuel kept at the reactor site, especially if the safety advantages of dry-cask storage are explained to them.
The Obama administration should make it emphatically clear to Japan’s government that the separation of more plutonium is in no one’s interest. The two countries should instead jointly lead a global effort to reduce existing stocks of separated plutonium by discouraging reprocessing and encouraging safe disposal of already separated stocks, which could be done, for example, by immobilizing the plutonium and placing it in three-mile-deep boreholes.
The waste of trillions of taxpayers’ yen is Japan’s problem. The risk it presents, however, is the whole world’s concern.
Frank N. von Hippel is a professor of public and international affairs at Princeton. Masafumi Takubo is a nuclear policy analyst based in Japan.
..............................................................................
Other relevant info is available from the Nuclear Regulatory Commission:
Storage of Spent Nuclear Fuel in Pools and Dry Casks
Radioactive Waste: Production, Storage, Disposal
Materials Safeguards and Threat Assessment
Transportation of Spent Nuclear Fuel
Locations of Independent Spent Fuel Storage Installations
Dry Spent Fuel Storage Designs: NRC Approved for General Use
Nuclear Fuel Pool Capacity
What We Regulate
There are two acceptable storage methods for spent fuel after it is removed from the reactor core:
Spent Fuel Pools - Currently, most spent nuclear fuel is safely stored in specially designed pools at individual reactor sites around the country.
Dry Cask Storage - If pool capacity is reached, licensees may move toward use of above-ground dry storage casks.
For additional information, see our Spent Fuel Storage in Pools and Dry Casks, Key Points and Questions & Answers page.
How We Regulate
The NRC regulates spent fuel through a combination of regulatory requirements, licensing; safety oversight, including inspection, assessment of performance; and enforcement; operational experience evaluation; and regulatory support activities.
For general information, see the How We Regulate page. For details, see the following:
Regulations, Guidance, and Communications
Licensing
Oversight
Public Involvement
Waste Confidence
Page Last Reviewed/Updated Thursday, October 18, 2012
.............................................................................
Finally, from the World Nuclear Association / Representing the people and organizations of the global nuclear alliance (a nuclear trade association)
Megatons to Megawatts / Military Warheads as a Source of Nuclear Fuel (last updated Aug, 2011)
• Weapons-grade uranium and plutonium surplus to military requirements in the USA and Russia is being made available for use as civil fuel.
• Weapons-grade uranium is highly enriched, to over 90% U-235 (the fissile isotope). Weapons-grade plutonium has over 93% Pu-239 and can be used, like reactor-grade plutonium, in fuel for electricity production.
• Highly-enriched uranium from weapons stockpiles is displacing some 10,600 tonnes of U3O8 production from mines each year, and meets about 13% of world reactor requirements.
For more than three decades concern has centered on the possibility that uranium intended for commercial nuclear power might be diverted for use in weapons. Today, however, attention is focused on the role of military uranium as a major source of fuel for commercial nuclear power.
Since 1987 the United States and countries of the former USSR have signed a series of disarmament treaties to reduce the nuclear arsenals by about 80%.
Nuclear materials declared surplus to military requirements by the USA and Russia are now being converted into fuel for commercial nuclear reactors. The main material is highly enriched uranium (HEU), containing at least 20% uranium-235 (U-235) and usually about 90% U-235. HEU can be blended down with uranium containing low levels of U-235 to produce low enriched uranium (LEU), typically less than 5% U-235, fuel for power reactors. It is blended with depleted uranium (mostly U-238), natural uranium (0.7% U-235), or partially-enriched uranium.
Highly-enriched uranium in US and Russian weapons and other military stockpiles amounts to about 2000 tonnes, equivalent to about twelve times annual world mine production.
World stockpiles of weapons-grade plutonium are reported to be some 260 tonnes, which if used in mixed oxide fuel in conventional reactors would be equivalent to a little over one year's world uranium production. Military plutonium can blended with uranium oxide to form mixed oxide (MOX) fuel.
After LEU or MOX is burned in power reactors, the spent fuel is not suitable for weapons manufacture.
.............................................................................
Any questions?!